Leicestershire

Fascia signage in Market Harborough

Fascia signage in Market Harborough start from about £750 plus VAT for a standard opening, with a free survey and a written quotation before anything is ordered.

For Market Harborough shops and offices, we survey the opening before any price is given and the fascia signage are then made to those dimensions.

Timescales

Allow 2-3 weeks after artwork approval from drawings to delivery. On site, most Market Harborough jobs take one or two days. If you cannot close, we can work outside trading hours.

Specification notes

The fascia is the one part of the frontage people read from across the street. Popular choices include halo, face-lit or trough lighting; built to your brand guidelines.

Coverage

Our Market Harborough jobs sit within Leicestershire and the LE postcode area, which puts it on the same route as Coalville, Leicester and Loughborough.

Local planning

Harborough District Council decides planning in Market Harborough. Replacing an existing frontage in the same style seldom needs permission, whereas a new look, an outside shutter box or a lit fascia generally needs an application. We check which applies to your unit at survey.

Price guide

Budget from £750 plus VAT as a starting point. The real figure comes from the survey measurements. The written quotation is valid for 90 days.

Before you book

What do you need from me to quote?

The address, roughly what you want, and a photo of the current frontage. Opening sizes help but are not essential, because we measure at survey anyway.

How much does fascia signage cost in Market Harborough?

Fascia signage start from around £750 plus VAT for a standard opening. The exact figure depends on the width, height, finish and access, and comes from a free site survey as a written, itemised quotation.

Do I need planning permission in Market Harborough?

Like-for-like replacements usually do not. Changing the appearance of the frontage, fitting an external roller shutter or adding an illuminated sign usually needs consent from Harborough District Council. We tell you which applies at survey.

How long does it take?

Lead time for fascia signage is typically 2-3 weeks after artwork approval. Installation itself is usually one to two days on site for a standard unit.

Close to Market Harborough:

Other work we do in Market Harborough:

CallFree survey